Construction Plan Review

Overview

Construction plan review is a necessary step in the permitting process between Planning Commission approval and actual land disturbance. If a project involves land disturbance of any kind, an erosion control permit and land disturbance permit may be required.


Submittal Process


  • 1 full size set of construction plans
  • 1 stamped copy of the drainage report and calculations
Plans are to be submitted in PDF format and emailed to Shane Shamanur.  Plans are reviewed on a first come first serve basis and review times will depend on workload.

After plans are reviewed, comments will be issued to whomever submitted the drawings. Once comments have been satisfied, final sets will be asked for. These sets will be stamped as the approved documents. After plans have been approved, there must be a pre-construction meeting before construction can begin. Please see Stormwater-Sewer Developers Packet below (Helpful Links) for all information that is required to schedule pre-construction meeting.

Questions

If you have any questions about the construction plan review process, please contact 
Shane Shamanur, City Engineer - sshamanur@mtjuliet-tn.gov.